Twists and Turns® Newsletter Errata
Aran Sweater Design Errata
If you have a copy from the first or second printings, please note the following corrections:
- On page 152 under the Set-In Sleeve Pullover Project, the instructions for the pattern set-up row state to work the "4 sts of chart/patt B." That is incorrect. Chart/patt B has 5 stitches, not 4, so the instructions for the Back and Front should read as follows (corrected numbers are in bold type):
Back: Using smaller needles, cast on 134 (144, 154, 164, 174) sts. Work 6 rows Garter Stitch (knit every row), end having worked a RS row.
Change to larger needles and est patt as foll: 11 (16, 21, 26, 31) sts Sand Stitch, p1, 7 sts chart/patt A, 5 sts chart/patt B, 16 sts chart/patt C, 5 sts chart/patt B, 7 sts chart/patt A, 30 sts chart/patt D, 7 sts chart/patt A, 5 sts chart/patt B, 16 sts chart/patt C, 5 sts chart/patt B, 7 sts chart/patt A, p1, 11 (16, 21, 26, 31) sts Sand Stitch.
Cont in patt as est until piece measures 17 ¾ (17 ¼, 19, 18 ½, 18)" from cast-on edge.
Shape armholes: Bind off 4 (6, 8, 10, 12) sts at beg of next two rows, then one st at beg of next 8 (12, 16, 16, 16) rows—118 (120, 122, 128, 134) sts. Cont in patt as est until Back measures approx 7 (7½, 8, 8½, 9)" from beg of armhole shaping, ending with Row 9 of chart/patt D. Bind off 12 (12, 12, 12, 13) sts at beg of next four rows. Bind off rem 70 (72, 74, 80, 82) sts or place on holder.
Front: Work as for Back until Front measures approx 4 (4 ½, 5, 5 ½, 6)" from beg of armhole shaping, ending with Row 13 of chart/patt D. Work across 47 (48, 49, 51, 54) sts, bind off or place center 24 (24, 24, 26, 26) sts on holder for base of neck opening, then work across rem 47 (48, 49, 51, 54) sts. Working each side separately, bind off one st at neck edge every other row 5 (5, 5, 7, 7) times. Cont in patt as est until Front measures same as Back from beg of armhole shaping. Shape shoulders same as Back.
- On page 163, row 7 of the chart, four stitches in from the right side of the chart should be a symbol for a knit stitch, not a purl. The written instructions are correct.
Cables, Volume 1: The Basics Errata
- On page 46, the swatch does not match the chart. The swatch has two knitted columns separated by one purl stitch; the chart and description indicate that they are separated by two purl stitches.
- On page 114, the chart is correct, but the instructions for row 12 are not. They should read: "P1, (3/1 RPC, p2 3/1 LPC) twice, p1." The RPC and LPC are backwards.
- The chart on page 184 is correct, but the instructions in row 36 of the accompanying pattern on page 185 are not. Row 36 should read: "P9, 3/1/3 LC, p9."
Taste of Aran Afghan
Errata for the compilation can be found here.
|