Escher Cable Vest (Spring 2003)
I indicated that one multiple of the stitch pattern should measure 2 5/8" when in reality, it should measure 4". The width from diamond point to diamond point measures about 2 5/8" and I planned originally that it would be the stitch multiple. I changed the stitch multiple, to that which appears in the chart, but forgot to change the measurement.
Garland with Bobbles Afghan Square (Spring 2003)
The bobble instructions are missing. They should read: [K1, yo, k1, yo, k1] into next stitch, turn; p5, turn; k2tog, k1, SSK, turn; p3, turn; slip 2—k1—p2sso. Bobble completed.
Bonnie's Bags (Summer 2003)
Chart B is correct, but the written instructions are not. They should read:
Row 1 and all WS rows: [P2, k2] five times, p2
Row 2: [K2, p2] five times, k2
Row 4: correct as written
Row 6: [K2, p2] five times, k2
Row 8: correct as written
Rick's Aran (Fall 2003)
Under Saddles, the instructions stae to use smaller needles. This is incorrect. The saddles should be knit using the larger sized needles. The smaller sized needles are used on the ribbing sections only. |